Windmere, promoted by Devinarayan is an upcoming deluxe residential project in a semi-urban location of Chennai city. Plans for this project include 14 home units comprising of both 2 and 3 bedroom apartments. An additional stilt level will provide space for parking and other facilities. Windmere is being developed in a residential neighbourhood right next door to a number of large establishments from IT parks to reputed educational institutions.

 Location  Karapakkam
 Land size  12,972 sq feet
 No of floors  4
 No of apartments per floor
  •  1st, 2nd and 3rd floor: 4 units
  • 4th floor: 2 units
 No of blocks  1
 Total no of apartments  14
 Sq feet range  1393 – 2102 sq feet
Types of apartments
  • 2 BHK: 6 units
  • 3 BHK: 8 units
 Expected commencement of Schedule  June 2012
 Expected completion of schedule  December 2013

  • A 2-minute drive from Rajiv Gandhi Salai (OMR)
  • A 2-minute drive from KCG
  • 1 km from the upcoming Marg Riverside mall
  • 4 kms from the AKDR Golf Village in Thoraipakkam
  • A 2-minute drive to the Shollingnallur junction
  • Close to the backwaters of Karapakkam behind Sanmar Industries
  • Clubhouse
  • Covered car park
  • Gymnasium
  • Auto door elevator for each block
  • Video door phone control access
  • 24 hours security
  • Security intercom
  • Intercom facility
  • DTH
  • Piped gas line
  • 100% power back up
  • Sewage treatment plant
  • Recreation area
  • Wi-Fi access
BHK  Floors  Flat Name  Saleable Area  Floor plan Status
 3BHK  First  1 – A  1938  Click to view floor plan  Available
 3BHK  First  1 – B  1399  Click to view floor plan  Available
 3BHK  First  1 – C  1944  Click to view floor plan  Available
 3BHK  First  1 – D  1393  Click to view floor plan  Available
 3BHK  Second  2 – A  1913  Click to view floor plan  Available
 3BHK  Second  2 – B  1399  Click to view floor plan  Available
 3BHK  Second  2 – C  1919  Click to view floor plan  Available
 3BHK  Second  2 – D  1393  Click to view floor plan  Available
 3BHK  Third  3 – A  1913  Click to view floor plan  Available
 3BHK  Third  3 – B  1399  Click to view floor plan  Available
 3BHK  Third  3 – C  1919  Click to view floor plan  Available
 3BHK  Third  3 – D  1393  Click to view floor plan  Available
 3BHK  Fourth  4 – E  2102  Click to view floor plan  Available
 3BHK  Fourth  4 – F  2082  Click to view floor plan  Available

Flooring

  • Living/Dining/Common area/Bedrooms/Kitchen: Vitrified tiles (size: 600 x 600mm)
  • Utility/Balconies/Toilets: Anti-skid ceramic tiles(size: 300 x 300mm)

Wall tiles

  • Good quality glazed/ceramic tiles for wall dadoing in toilets, kitchen and utility

Wall finishes

  • Ceiling and internal walls will be plastered smooth and finished with distemper paint

Joinery

  • Main door: Hard-wood door with flush door finished with French polish/melamine
  • Bedrooms and kitchen doors: Hard-wood frames with molded flush shutters and enamel paint finish
  • Toilets: Hard-wood frame/PVC coated molded flush shutter with paint finish
  • Windows: UPVC frames and glazed sliding shutters with insect proof screens

Kitchen

  • Polished black granite counter top of area up to 32 sq feet
  • Single bowl, single drain stainless steel sink of approved make
  • Glazed tile dado up to 2 feet height above the counter top

Toilets

  • Glazed tile wall dado up to ceiling height
  • Provision for geyser and exhaust fan point
  • Plain soft-coloured sanitary ware of approved make
  • Chromium plated plumbing fixtures of Kohler/Grohe/equivalent well-known brands

Electrical

  • Concealed wiring using PVC sheathed multi-strand copper wire of suitable gauge
  • Flush mounted modular switches and sockets with isolators
  • MCBs and ELCB mounted on individual distribution boxes for each apartment
 Schedule of Payment  Amount in Percentage
 On issue of allotment letter  3%
 On execution of agreements  27%
 On commencement of foundation works  20%
 On casting of roof slab  20%
 On commencement of masonry works(brick/block)  10%
 On commencement of plastering works  10%
 On commencement of finishing works  7%
 On completion & against possession  3%
Architects: Edifice (Mr.Pramod Balakrishnan)

Leave a Reply

Your email address will not be published.

Post comment